Results 1 to 2 of 2

Thread: how long to wait

  1. #1
    Senior Member
    bazzy's Avatar
    Join Date
    Oct 2009
    Location
    Ipswich, Queensland, Australia, Earth
    Age
    36
    Posts
    672
    Thanks
    16
    Thanked 167 Times in 102 Posts
    Rep Power
    263
    Reputation
    3285

    Default how long to wait

    I am waiting on a quote to come back for concreting a slab for the shed / garage being built

    however i am wanting to get the paperwork off to the bank asap. the concrete quote came back from the shed company itself however i am still waiting on the private concrete contractor i have asked myself.

    should i set an arbitrary deadline of lets say Wednesday? as i am wanting the process to get a move along and submit everything to the bank.

    should it take a number of days for someone to do a quote?



Look Here ->
  • #2
    Senior Member

    Join Date
    Jul 2010
    Posts
    2,235
    Thanks
    2,822
    Thanked 1,514 Times in 835 Posts
    Rep Power
    795
    Reputation
    27703

    Default

    some complex jobs do take time to quote , maybe the bloke is waiting for someone else to get back to him with drawing up the plans or a price or materials etc ?

    comcreters though usually do quotes on the spot , its often just a volume with allowances made for site works or a pump .

    be careful though if this bloke mucks you around the shed mob will not be happy. which is why they use their own blokes to do the pour

  • Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •