Results 1 to 13 of 13

Thread: pics

  1. #1
    Junior Member fastwrx's Avatar
    Join Date
    Jan 2008
    Posts
    73
    Thanks
    1
    Thanked 5 Times in 2 Posts
    Rep Power
    202
    Reputation
    56

    Default pics




Look Here ->
  • #2
    Junior Member
    Join Date
    Nov 2008
    Location
    Southwest Brisbane
    Age
    55
    Posts
    16
    Thanks
    2
    Thanked 0 Times in 0 Posts
    Rep Power
    0
    Reputation
    10

    Default

    Typical. Nice work on the cabling and separation and then the sparky runs his shit across the top.
    This is a very nice job fastwrx, I'm impressed.

  • #3
    Junior Member
    Join Date
    Jun 2008
    Posts
    39
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Rep Power
    195
    Reputation
    10

    Default

    Looks more like temp construction wiring on the sparkeys side - nice job on the cabling and layout

  • #4
    Junior Member fastwrx's Avatar
    Join Date
    Jan 2008
    Posts
    73
    Thanks
    1
    Thanked 5 Times in 2 Posts
    Rep Power
    202
    Reputation
    56

    Default

    yeah it's temp cabling from the sparkies. We're finishing off a few jobs this month and I've been really happy with how they've turned out. Believe it or not this one actually works the way we planned it to

    3 four door controllers, 1 lift controller running two cars. Not our biggest job going at the moment, but the best job overall.

  • #5
    Banned
    watchdog's Avatar
    Join Date
    Jan 2008
    Posts
    2,966
    Thanks
    136
    Thanked 869 Times in 514 Posts
    Rep Power
    0
    Reputation
    8320

    Default

    check out the sparky's workmanship on the bottom left hand side GPO

  • #6
    Junior Member
    Join Date
    Aug 2008
    Posts
    61
    Thanks
    0
    Thanked 1 Time in 1 Post
    Rep Power
    194
    Reputation
    15

    Default

    oops double up! .. sorry

  • #7
    Junior Member
    Join Date
    Aug 2008
    Posts
    61
    Thanks
    0
    Thanked 1 Time in 1 Post
    Rep Power
    194
    Reputation
    15

    Default

    Nice work! the only thing I would add is some covers over the plug packs and power leads. Although it looks like its all in a secure room so probably not an issue.

  • #8
    Junior Member fastwrx's Avatar
    Join Date
    Jan 2008
    Posts
    73
    Thanks
    1
    Thanked 5 Times in 2 Posts
    Rep Power
    202
    Reputation
    56

    Default

    Quote Originally Posted by watchdog View Post
    check out the sparky's workmanship on the bottom left hand side GPO
    don't pick on the sparky too much, the bottom 4 door controller was an afterthought

  • #9
    Junior Member fastwrx's Avatar
    Join Date
    Jan 2008
    Posts
    73
    Thanks
    1
    Thanked 5 Times in 2 Posts
    Rep Power
    202
    Reputation
    56

    Default

    Quote Originally Posted by ArjanH View Post
    Nice work! the only thing I would add is some covers over the plug packs and power leads. Although it looks like its all in a secure room so probably not an issue.
    yeah we have our very own secure room on this install, but I'll get some plug tops and shorten some of those leads before hand over.

    I wish I could take the credit for the amazing job my offsider did of mounting the RAS on the solid concrete wall....

  • #10
    Junior Member
    Join Date
    Aug 2008
    Posts
    61
    Thanks
    0
    Thanked 1 Time in 1 Post
    Rep Power
    194
    Reputation
    15

    Default

    Quote Originally Posted by fastwrx View Post
    yeah we have our very own secure room on this install, but I'll get some plug tops and shorten some of those leads before hand over.

    I wish I could take the credit for the amazing job my offsider did of mounting the RAS on the solid concrete wall....
    Heh ... only just spotted that ... yeah nice work ... masonary bit on a wicked angle?

    I just spent 5 minutes looking at your avatar waiting for her to do something else. LOL

  • #11
    Junior Member
    Join Date
    Jan 2008
    Posts
    95
    Thanks
    17
    Thanked 10 Times in 7 Posts
    Rep Power
    203
    Reputation
    95

    Default

    Again, Nice work. I also like the fact that you take pride in the work you/your employees do, but are also willing to concede things don't always work out as planned.
    I have a lot more respect for people that will admit when things go wrong or not as planned over those that try and hide it.

  • #12
    Junior Member
    Join Date
    Nov 2008
    Age
    48
    Posts
    2
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Rep Power
    0
    Reputation
    10

    Default

    You obviously take pride in your work. Well done mate.

  • #13
    Junior Member fastwrx's Avatar
    Join Date
    Jan 2008
    Posts
    73
    Thanks
    1
    Thanked 5 Times in 2 Posts
    Rep Power
    202
    Reputation
    56

    Default

    after 25 years of doing this stuff, i'm starting to get good

  • Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •