Originally Posted by
Joey
I had never heard of CEEG until I read this thread and I have been playing around with this stuff for a few years. , Doesn't mean they are no good though.
You really need to read the fine print when it comes to PV module warranty , it's not a replacement warranty like it is made out to imply , it's more a warranty that the module with produce a certain percentage of it's rated output on a sliding scale until 25 years is reached., the replacement warranty varies greatly between different manufacturers so do some research.
Government may take up to 8 weeks , should read will take minimum of 8 weeks and then start waiting to receive grant.
The pre-approval process normally takes about 3 weeks.
The money is paid into your specified account and you can be notified when the funds have been deposited.
First they will give you pre-approval of the funding and will only pay the 8000 once the job is complete and notice of completion has been sent to them.
Dont worry they dont hand out this 8K on anyones word , they required your signature of completion , the installers signature and must be accredited , the system has to be connected to the grid, photos of the installation with wide shots showing it is your actual residence it is installed at.
The completion paper work has to contain these photo's ( at least 3 non digital photo's ) connection completed paper work from energy provider , complete and detailed technical drawing of layout and specifications , complete detailed itemized invoices showing all components , labor , design costs less GST etc .
Any mistakes or anything missing no questions are asked it is all sent back and the waiting process starts all over again.