    Default Are we allowed to ......

    If I get a 2.5-3.0kw grid feed solar installion now, and some time in the future expand it to 5kw would I be eligable for the power company to buy the extra power. Or does this government rebate stuff the we get now lock us in.

    At present I have roof space for 2.5kw, some time in the future I am getting a large shed put in the yard and would like to add more panels to another inverter (or if the first inverter has a 2nd input then us that).

    Panels are getting cheaper (for now), and while I can afford a 5kw system now I just don't have usable space for it. So I thought about getting the best I can for now and adding later.

    Does the power company care if I have a 2.5kw system and in say 12 months time start dumping 5kw into the grid or will they kick up a stinky?.
    Last edited by skozzy; 17-11-10 at 12:43 AM.



Look Here ->
  • #2
    Senior Member
    Join Date
    Feb 2008
    Posts
    831
    Thanks
    174
    Thanked 434 Times in 193 Posts
    Rep Power
    269
    Reputation
    2277

    Default

    Quote Originally Posted by skozzy View Post
    If I get a 2.5-3.0kw grid feed solar installion now, and some time in the future expand it to 5kw would I be eligable for the power company to buy the extra power. Or does this government rebate stuff the we get now lock us in.

    At present I have roof space for 2.5kw, some time in the future I am getting a large shed put in the yard and would like to add more panels to another inverter (or if the first inverter has a 2nd input then us that).

    Panels are getting cheaper (for now), and while I can afford a 5kw system now I just don't have usable space for it. So I thought about getting the best I can for now and adding later.

    Does the power company care if I have a 2.5kw system and in say 12 months time start dumping 5kw into the grid or will they kick up a stinky?.
    Sure mate nothing stopping you increasing the size as long as you get approval from your supplier first , you can't just add to it without informing them unless you are just adding a panel or 2.
    Best to get the 2.5kw system now and when you are ready add a another system in parallel , by the time you are ready if even only 12 months away you can be certain prices will be lower .

    In WA the maximum we are allowed in 5kw , in some states it's up to 10kw , but that's not a guarantee it will be approved.