Results 1 to 12 of 12

Thread: price of cat5e install

  1. #1
    Junior Member
    Join Date
    Feb 2008
    Age
    52
    Posts
    57
    Thanks
    5
    Thanked 1 Time in 1 Post
    Rep Power
    198
    Reputation
    15

    Default price of cat5e install

    What is the going rate of a network point wired and terminated these days for say a 25 to 30 meter run?



Look Here ->
  • #2
    Senior Member
    Join Date
    Jan 2008
    Posts
    701
    Thanks
    13
    Thanked 51 Times in 40 Posts
    Rep Power
    226
    Reputation
    257

    Default

    just 1 point???

  • #3
    Junior Member
    Join Date
    Feb 2008
    Age
    52
    Posts
    57
    Thanks
    5
    Thanked 1 Time in 1 Post
    Rep Power
    198
    Reputation
    15

    Default

    need 28 points

  • #4
    Junior Member
    Join Date
    Jan 2008
    Posts
    49
    Thanks
    0
    Thanked 3 Times in 3 Posts
    Rep Power
    199
    Reputation
    22

    Default

    Private or done commerically?

    Parts supplied? so just labour?

    Where based as differant places charge differant rates.

    Need cabinet?

  • #5
    Junior Member
    Join Date
    Feb 2008
    Age
    52
    Posts
    57
    Thanks
    5
    Thanked 1 Time in 1 Post
    Rep Power
    198
    Reputation
    15

    Default

    Commercial Coburg Sockets Cable Supplied

  • #6
    Member
    Join Date
    Jan 2008
    Location
    Super Duper Secret Members Forum
    Posts
    374
    Thanks
    0
    Thanked 2 Times in 2 Posts
    Rep Power
    0
    Reputation
    21

    Default

    Cable supplied or already been run???

    There's a lot of variables. Explain where it's at when when you want the dude to come in and hook stuff up, and what you want at the end.

  • #7
    Premium Lager

    Join Date
    Jan 2008
    Age
    60
    Posts
    4,882
    Thanks
    1,635
    Thanked 2,711 Times in 1,230 Posts
    Rep Power
    1175
    Reputation
    40746

    Default

    and whether or not you have to crawl under floors/roof's. Double story, internal walls, brick....the list goes on and on

  • #8
    Junior Member
    Join Date
    Jan 2008
    Posts
    120
    Thanks
    18
    Thanked 0 Times in 0 Posts
    Rep Power
    203
    Reputation
    10

    Default

    Cat5e $120-$150 per point cat6 $180-$220 PP Panduit certified 25 years warrnt

  • #9
    Senior Member
    intelliGEORGE's Avatar
    Join Date
    Jan 2008
    Location
    Sydney, AUSTRALIA
    Age
    43
    Posts
    4,106
    Thanks
    884
    Thanked 1,484 Times in 691 Posts
    Rep Power
    479
    Reputation
    7236

    Default

    What REG said is about the going rate. Obviously discounted in larger jobs.

  • #10
    Junior Member
    Join Date
    Jan 2008
    Posts
    49
    Thanks
    0
    Thanked 3 Times in 3 Posts
    Rep Power
    199
    Reputation
    22

    Default

    if you have parts supplied,
    what is the building config?


    you be about 100 an hour , probly take 2 to 3 days , just in labour.
    I guess 14 doubles but

    those 28 , are they 28 outlets or 28 doubles???

  • #11
    Registered User manicretep's Avatar
    Join Date
    Jul 2008
    Location
    Da boondocks
    Age
    73
    Posts
    94
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Rep Power
    195
    Reputation
    10

    Default

    Also if the cable has been run by a non licensed Cabler, it would be unethical for a licensed cabler to connect sockets (as he could be fined), all cabling has to be compliant with ACMA regs,

    If someone runs the cable I always charge the same as if I did it, I run a 15m single o/l the other day $ 165.00 inc gst, was a prick of a place, 2 dif roofs(to get between the front pc and the rear) 1.5hrs and duct


    $ 125.00 to $ 220 is average here add $ 22 to make it a double.
    or $ 66 p/h if you supply min 2 hrs.

    28 outlets $ 3080.00 inc gst, cable, outlets and plates
    $ 2772.00 if you supply cable and bits.
    (site audit required to confirm price)

  • #12
    Premium Member mal's Avatar
    Join Date
    Jan 2008
    Posts
    492
    Thanks
    62
    Thanked 54 Times in 30 Posts
    Rep Power
    221
    Reputation
    347

    Default

    Did one a while ago with similar specs 34 points most were triple points I charged $135 per point after we had finish I did a costing and it would have worked out very close done on a hourly rate.
    Do suggest you make sure they do a certification with a printed report of each point

  • Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •