Ok guys this is will be my only thread in regards to this

so the story is i brought solar panels had them installed the night of the hookup to the grid the hot water service dies

called orgin and organised a DUX 315L Gas Boost Solar hot water service to be installed

so the progress so far

1 / Recieved email outlining me to contact them in regards to doing a site analysis - Completed organized this for the 15/3/12

2/ Site Analysis - will post photos up of proposed area for hot water service

3/ dux email in regards to additional Costs and install date

4/ confirm installation date and await the installation

5/ Install day - hell of a lot of pictures in regards to this

6/ HOT WATER - YAY no more traveling to mates place to have a shower

7/ energy savings of approx 60% off my bill + solar panels = very low bill from origin energy